Current Capital Projects in 2024

Construction and upgrading of (12) fuel stations in various locations across the Kingdom, and installation of
(88) electric vehicle chargers at company-owned and other locations throughout the Kingdom.

Continuation of the project to construct (5) LPG storage facilities at the company's Zarqa site, with a total
storage capacity of (10,000) tons, at an estimated cost of JD (33) million.

Continuation of the project to construct (2) LPG storage facilities at the company's Aqaba site, with a total
storage capacity of (4,000) tons, at an estimated cost of JD (15) million.

Installation and commissioning of (2) steam boilers, each with a capacity of 40 tons, at an estimated cost of
JD (10) million.

Continuation of the proposed modifications to the hydrogen compressor, at an estimated cost of JD (2)
million.

 Installation of protection systems on (24) crude oil and gasoline tanks to meet reinsurance
requirements, at an estimated cost of JD (1.7) million.

Construction of an 11-floor commercial building with an estimated area of 6,000 square meters at
anestimated cost of JD (1,5) million. 

 Upgrading a part of the firefighting system network at the company's Zarqa site at an estimated cost of JD
(600,000).

 Purchase of three jet fuel pumps at an estimated cost of JD (500,000).

Purchase of RBI software and its application to refinery equipment by a specialized company at an estimated
cost of JD (500,000).

Construction of an additional (5,000) cubic meter fire water tank at an estimated cost of JD (500,000).

Upgrading the soot blower system in the boilers, atmospheric distillation unit furnaces, and naphtha reforming
unit furnaces at an estimated cost of JD (500,000).

Purchase of four V400 electric motors and their associated control panels, operating on a variable speed
drive (VSD) system for the cooling tower fans, at an estimated cost of JD (423,000).

Upgrading and expanding the automation system (PLC System) at Queen Alia International Airport at an
estimated cost of JD (400,000).

Construction of four crude oil loading platforms at the company's Aqaba storage tanks at an estimated cost
of JD (400,000).

 Replacement of six pumps used to feed the ground line at Queen Alia International Airport at an estimated
cost of JD (300,000).

Installation of a 500 kW solar power system at the company's Zarqa site at an estimated cost of JD (250,000).

Purchase of valves for the liquefied gas storage tank lines at the Aqaba depots at an estimated cost of JD
(250,000).

Supply of a crude oil distillation apparatus at an estimated cost of JD (250,000).

Supply of heat exchangers for the FCC unit at an estimated cost of JD (250,000).

Supply of two air compressors for the control system relevant to LPG Sphere Tanks at an estimated cost of JD
(200,000).

Supply of Valves’ Testing Machine for testing safety and shut-off valves at an estimated cost of JD (170,000).

Purchase of two small AVGAS refuelers (bowsers) for Amman Civil Airport at an estimated cost of JD (150,000).

Installation of a weighbridge at Queen Alia International Airport at an estimated cost of JD (150,000).

Supply of two Reduced Crude pumps for Crude Distillation Unit III (CDU-3) at an estimated cost of JD (150,000).

Construction of oily water collection basins at an estimated cost of JD (150,000).

Installation of two 100-ton capacity entry weighbridges with weighbridge control room at the LPG tanks, and
weighbridge with a weighbridge control room at the exit, at an estimated cost of JD (150,000).

Purchase of an oxidation stability testing device for jet fuel at an estimated cost of JD (120,000).

Procurement of an oxidation stability testing device for jet fuel at an estimated cost of JD (120,000).

Purchase of two pressure vessels for the catalytic cracking unit to replace the existing two vessels at an
estimated cost of JD (120,000).

Procurement of two 5-ton forklifts at an estimated cost of JD (100,000).

Procurement of three small portable air compressors at an estimated cost of JD (93,000).

Procurement of two 2-ton forklifts for lifting asphalt drums and catalyst drums at an estimated cost of JD